>Product Application Range
This shaft sinking headframe is a large scale temporary steel structure system specifically designed for vertical shaft construction, offering high adaptability, efficiency, and cost effectiveness. It is suitable for vertical shaft projects in various mines, including metal and non metallic mines. It can be flexibly configured according to different shaft diameters, depths, and process requirements, providing a reliable aerial working and load-transfer platform for shaft excavation.
>Structural Features and Working Principle
Modular Design: Utilizes standardized steel structures with bolted connections, enabling rapid assembly, disassembly, and reuse.Clear Load Transfer:Vertical Loads:Head sheaves → Sheave platform → Main truss → Foundation → Ground Horizontal Loads: Transferred and resolved through spatial trusses and bracing systems. Multi Functional Integration.
Sheave Platform: Centralized control hub for hoisting and suspension systems.
Muck Tipping Platform:Area for muck transfer operations.Open Shaft Center: Ensures unobstructed passage for large equipment.
High Adaptability: Supports customization for heavy equipment (e.g., drill rigs) and specialized construction methods (e.g., freezing method, drilling method).System Positioning: Integrates hoisting, suspension, material transfer, and protective functions, serving as a critical system for safe and rapid vertical shaft construction.
